Cloud Migration planned by the 6 Rs, not a blind lift and shift.

Rehost, replatform, and refactor moves. Dependency mapping with Azure Migrate and AWS Migration Hub, wave planning, cutover runbooks, and right-sizing once you land.

Our cloud migration clients cut over without the 2am rollback metrics

Two recent cloud migration engagements. Full workload and cost figures under MNDA; wave plan walkthrough on the scoping call.

Cloud and Data engagement

Cloud and Data engagement,
Cloud migration program lead

Dcrayon mapped every workload to a rehost or replatform decision before we opened Azure Migrate. Cutover ran off a tested rollback plan, and finance got a per-workload cost line they could sign off.

MNDA

Per-workload run cost before and after, shared on scoping call

90 days

Cutover downtime window per wave

Cloud Migration engagement: dependency mapping, wave planning through AWS Application Migration Service, and a rehearsed cutover with rollback checkpoints. Either side can pause at any wave boundary.

Read Cloud and Data engagement's Case Study
Mid-market cloud and data brand

Mid-market cloud and data brand,
Cloud migration and landing zone program

Our migration had stalled on a tangle of undocumented dependencies. Dcrayon ran a discovery pass, grouped workloads into waves, and moved the first low-risk wave with no unplanned downtime.

MNDA

Workloads migrated and legacy hosts decommissioned, shared on scoping call

90 days

Rollback checkpoints tested per wave

Cloud Migration engagement paired with landing zone setup and database moves through managed replication. A discovery audit in the opening phase set the workload inventory and baseline.

Read Mid-market cloud and data brand's Case Study

HOW DCRAYON CLOUD MIGRATION WORKS

How Dcrayon sequences a cloud migration, wave by wave

How Dcrayon sequences a cloud migration, wave by wave
A short walkthrough of a Dcrayon cloud migration engagement, from the week-one discovery readout to a hardened, right-sized landing zone in the final cycle.

Technical migration controls we build into every move

What we wire into every Dcrayon cloud migration by default

Each control below maps to a checkpoint in your migration plan, verified by the cloud architect who owns your account.
  • Documented cutover and rollback

    Documented cutover and rollback

    Every wave ships with a tested runbook: cutover steps, rollback triggers, validation checks, and a dependency map you can hand to auditors.

  • Automated discovery and right-sizing

    Automated discovery and right-sizing

    Dcrayon AI runs agentless discovery, dependency mapping, and cost modeling before a single workload moves, then watches for drift after you land.

  • Right-sizing and reserved capacity

    Right-sizing and reserved capacity

    Post-move right-sizing, reserved instances, and savings plans cut the bill lift and shift usually inflates.

    We report cost per workload, not just total spend.

  • Landing zone guardrails

    Landing zone guardrails

    Each workload lands in a governed landing zone with least-privilege IAM, encryption at rest and in transit, network segmentation, and logging ready for SOC 2 and ISO 27001.

How a Dcrayon cloud migration runs

Three repeatable plays that move workloads with less risk and a lower run-rate each cycle.

Step 1: Score

A free Dcrayon Score readout on your estate in one business day. We run assessments with tools like Azure Migrate, map dependencies, and sort each app into rehost, replatform, or refactor. You get one 0 to 100 number and the gap list, no commitment.

Step 2: Plan

A written 90-day cloud migration plan tied to one number you pick, like monthly cloud spend or cutover downtime. A senior architect designs the landing zone and wave sequence, including any database migration path. Either side can stop, and there is no annual lock-in.

Step 3: Harden

A weekly working session with your architect and a monthly cost-and-progress report your finance team can follow. Migration runs in waves: the pilot workload proves the pattern, then each later wave reuses the same landing zone and pipelines.

Google Reviews
0
Reviews
Clutch
0
Reviews
Fiverr
0
Reviews

The migration readiness Score is free. The wave plan is yours to keep.

Across our 60+ active solutions retainers, teams running without a planned cloud migration tend to see Rs 6L to Rs 90L in twelve-month waste, from idle capacity and stalled workloads. Book the scoping call to size yours.

Free Dcrayon migration-readiness Score on your current estate

Written wave plan and 6 Rs disposition for every workload

Mutual exit clause in every SoW, no annual lock-in
The cloud architect who scopes the move also runs it
The migration readiness Score is free. The wave plan is yours to keep.

Cloud Migration FAQs

It begins with discovery: an agentless inventory, dependency mapping, and a 6 Rs disposition per workload. That readout becomes the wave plan you approve before any cutover.

Both. Some clients hand us the whole cloud and data team; others use us as senior architect plus escalation for their own engineers. We scope per account.

Most cloud migration engagements start at Rs 4 to 8 lakhs per month in India, or USD 6 to 15 thousand per month globally. Audit and discovery-only work starts lower.

Yes. You get a free Dcrayon migration-readiness Score on a proposal call, with the workload gaps behind the number. No follow-on commitment.